[Phase]: Construction Documents

Documents below are listed chronologically. Use the links on the left or below to filter documents by keyword. Use the links above to jump to a specific year on this page.

17 files


    2003---------Jump to [Top] [Organization] [Concept] [SI] [Discipline] [Topic] [Phase] [Audience]
  1. Qinshan CANDU Project Construction Experiences and Lessons Learned to Reduce Capital Costs and Schedule Based on Qinshan CANDU Project in China, by Ken Petrunik, Kang Rixin, AECL, 01/02/2003. Doc type: Paper.
    Summary:
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - 20031701.pdf (1470 kb)
    - 20031901.pdf (513 kb)
  2. Chemistry Control Requirements for Generic CANDU Power Stations, by Stu Groom, NB Power, 01/05/2003. Doc type: Presentation.
    Summary: A series of presentations by Stu Groom to the Karachi Nuclear Power Plant (KANUPP) in May 2003 as a part of an IAEA 5-day training program to review the chemistry control requirements of the Karachi Nuclear Power Plant.
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - Basic Chemistry Concepts 20032101.pdf (833 kb)
    - Moderator System Chemistry Control 20032102.pdf (264 kb)
    - Annulus Gas System Chemistry Control 20032103.pdf (362 kb)
    - Primary Heat Transport System Chemistry Control 20032104.pdf (667 kb)
    - Feeder Thinning 20032105.pdf (600 kb)
    - Boiler Feedwater / Condensate Chemistry Control 20032106.pdf (605 kb)
    - Steam Generator Chemistry Control 20032107.pdf (430 kb)
    - ECC and Dousing Systems Chemistry Control 20032108.pdf (116 kb)
    - Spent Fuel Bay Chemistry Control 20032109.pdf (85 kb)
    - Plant Chemistry Controm - PLGS Manual 20032110.pdf (4826 kb)
    - PHT System Chemitry Monitoring and Control Improvements 20032111.pdf (753 kb)
    - Chemistry Laboratory Analytical Procedure – Gadolinium Arsenazo III 20032112.pdf (175 kb)
    - Chemistry Specifications 20032113.pdf (119 kb)
  3. Qinshan Project, by Ken Petrunik, AECL, 01/06/2003. Doc type: Presentation.
    Summary:
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - CNS 2003 Conference Paper 20031801.pdf (3687 kb)

  4. 2010---------Jump to [Top] [Organization] [Concept] [SI] [Discipline] [Topic] [Phase] [Audience]
  5. Why Ontario Generates So Much Electricity from Nuclear Energy, by Lorne G. McConnell, CNA, 01/03/2010. Doc type: Paper.
    Summary: This historical review provides an excellent summary of the context in which CANDU was conceived, designed, built, commissioned and operated. The origins of some of the major characteristic features of CANDU are also given. Note: Figure G3 herein is a corrected version of the original published version which contained a scale error.
    Keywords: [Concept] - [SI] 00000 General Project [Discipline] History [Topic] Intro and Overview [Phase] Commissioning Concept Construction Design Operation [Audience] College
    - 20100500.pdf (5844 kb)